Minimum Plan Check Submittal Checklist

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Residential:

❑ New      ❑ Addition      ❑ Remodel

Commercial:

❑ New      ❑ Addition      ❑ Remodel      ❑ Tenant Improvement

Permit Center Staff will review this checklist prior to plan check submittal to ensure completeness. Please print and complete the form prior to arriving at the permit counter.

DOCUMENTS

Check if Provided

GENERAL

Completed building permit application form

 

Scope of work documented on the plans

 

Documented cost estimate to establish valuation

 

SUPPORTING

DOCUMENTS

Project data (APN#, type of construction, occupancy classification, floor area, lot coverage, floor area ratio, existing use, proposed use)

 

Structural calculations, if applicable

 

Geotechnical soils investigation report or completed Modification of e Form to Codwaive soils investigation report

 

Title 24 energy compliance report, if applicable

 

Manufacture Specifications

 

COVER SHEET

Site plan (including north arrow with scale, contours, setbacks, property boundaries with dimensions, structures (existing and proposed), location of roads, driveways, easements, site utilities, supply lines and meter locations, wells, septic system with leach lines, direction of drainage, floodplain, vegetation and trees, etc.)

 

Project data (assessor’s parcel number, type of construction, occupancy classification, square footage, lot coverage, floor area ratio, etc.)

 

Name and address of property owner

 

Name and address of site plan preparer

 

Deferred submittal notes

 

Special Inspection Items

 

PLANS

Grading and drainage plans

 

General and fire life safety notes

 

Floor plans with framing details (existing-proposed)

 

Elevations (north, south, east and west) with section view referenced

 

Cross Sections/Details

 

Foundation plan with foundation details cross referenced

 

Roof framing plan with details

 

Title 24 energy certificate of compliance forms incorporate into plans

 

 Excavation and shoring plans  
 Structural framing plans  
 Structural details  
 Stairs and stair details (if applicable)  
 Disabled accessibility details (for commercial and new multifamily projects)  
 Plumbing plans (for commercial and multifamily projects)  
 Mechanical plans (for commercial and multifamily projects)  
 Electrical plans (for commercial and multifamily projects)  
Plumbing and Mechanical Isometric Drawings (for single family dwellings
and/or accessory buildings)
 
 OTHER Application for on-site wastewater system permit (new/repair/alternative/
Demolition of septic system)
 
Can and will serve from water or sewer purveyor  
Application for Monterey County encroachment permit (includes any structure or object of any kind or character placed, in, on under or over any county road)  
Monterey County address request form  
Owner/builder verification (if you as the owner will be pulling the permit)  
Monterey Peninsula Water Management District water form (required if you
Are within district boundaries and are adding or changing water fixtures)
 
Plan check requirement with Environmental Health for pools and spas  

 

To be completed by Applicant

I understand that an incomplete plan check submittal may result in delays in plan check.

Applicant Name: (Print)                                                                                           Signature:                                                                                        

Contact Phone Number:                                                                                      

E-mail:                                                                                            Date:                                                                            

APN: