Minimum Plan Check Submittal Checklist
Residential:
❑ New ❑ Addition ❑ Remodel
Commercial:
❑ New ❑ Addition ❑ Remodel ❑ Tenant Improvement
Permit Center Staff will review this checklist prior to plan check submittal to ensure completeness. Please print and complete the form prior to arriving at the permit counter.
DOCUMENTS |
Check if Provided |
|
GENERAL |
Completed building permit application form |
|
Scope of work documented on the plans |
|
|
Documented cost estimate to establish valuation |
|
|
SUPPORTING DOCUMENTS |
Project data (APN#, type of construction, occupancy classification, floor area, lot coverage, floor area ratio, existing use, proposed use) |
|
Structural calculations, if applicable |
|
|
Geotechnical soils investigation report or completed Modification of e Form to Codwaive soils investigation report |
|
|
Title 24 energy compliance report, if applicable |
|
|
Manufacture Specifications |
|
|
COVER SHEET |
Site plan (including north arrow with scale, contours, setbacks, property boundaries with dimensions, structures (existing and proposed), location of roads, driveways, easements, site utilities, supply lines and meter locations, wells, septic system with leach lines, direction of drainage, floodplain, vegetation and trees, etc.) |
|
Project data (assessor’s parcel number, type of construction, occupancy classification, square footage, lot coverage, floor area ratio, etc.) |
|
|
Name and address of property owner |
|
|
Name and address of site plan preparer |
|
|
Deferred submittal notes |
|
|
Special Inspection Items |
|
|
PLANS |
Grading and drainage plans |
|
General and fire life safety notes |
|
|
Floor plans with framing details (existing-proposed) |
|
|
Elevations (north, south, east and west) with section view referenced |
|
|
Cross Sections/Details |
|
|
Foundation plan with foundation details cross referenced |
|
|
Roof framing plan with details |
|
|
Title 24 energy certificate of compliance forms incorporate into plans |
|
|
Excavation and shoring plans | ||
Structural framing plans | ||
Structural details | ||
Stairs and stair details (if applicable) | ||
Disabled accessibility details (for commercial and new multifamily projects) | ||
Plumbing plans (for commercial and multifamily projects) | ||
Mechanical plans (for commercial and multifamily projects) | ||
Electrical plans (for commercial and multifamily projects) | ||
Plumbing and Mechanical Isometric Drawings (for single family dwellings and/or accessory buildings) |
||
OTHER | Application for on-site wastewater system permit (new/repair/alternative/ Demolition of septic system) |
|
Can and will serve from water or sewer purveyor | ||
Application for Monterey County encroachment permit (includes any structure or object of any kind or character placed, in, on under or over any county road) | ||
Monterey County address request form | ||
Owner/builder verification (if you as the owner will be pulling the permit) | ||
Monterey Peninsula Water Management District water form (required if you Are within district boundaries and are adding or changing water fixtures) |
||
Plan check requirement with Environmental Health for pools and spas |
To be completed by Applicant
I understand that an incomplete plan check submittal may result in delays in plan check.
Applicant Name: (Print) Signature:
Contact Phone Number:
E-mail: Date:
APN: