Tank Installation And Pad Construction
Building Permit Submittal Requirements
General Requirements For All Permit Submittals
• Plans are required to be legible and submitted electronically.
• Plans are required to be signed by the preparer on each sheet prior to issuance.
• Plans submittals are required to include the site address (job address) on the first sheet of the plans.
• Plans are required to be drawn to an appropriate scale and size.
• Plans that require calculations and/or specifications are required to be stamped and signed by a licensed preparer.
1. Complete Site Plans
• A complete site plan MAY be required for a project submittal of this type. The submittal will be forwarded, by the County, to all of the agencies necessary to review your project. See Preparing Building Plans.
2. Complete Sets Of Construction/Building Plans
• Complete construction drawings and details are required for a project submittal of this type.
See Preparing Building Plans.
3. Structural Calculations
• Structural Calculations are required for a project submittal of this type.
4. Geotechnical Report (Required for water tanks).
5. Soils Engineer Review Letter (Required for water tanks).
This document is intended only as a guide. Specific requirements or documents may differ based upon your specific application and the building code.