Carmel Lagoon Draft Environmental Impact Report

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

This is the 2016 Draft EIR.  To be connected to the 2024 Revised Draft EIR, please click here.

Cover
Table of Contents

1.0 Introduction (Section 1.0 includes subsections 1.1 - 1.5)
  • 1.1 Purpose of the EIR
  • 1.2 Proposed Project Overview
  • 1.3 CEQA Process
  • 1.4 Project Approval and Permitting Process
  • 1.5 Organization of the Draft EIR
2.0 Summary (Section 2.0 includes subsections 2.1 - 2.6)
  • 2.1 lntroduction
  • 2.2 Proposed Project Objectives
  • 2.3 Summary of the Proposed Project
  • 2.4 Summary of Impacts and Mitigation Measures
  • 2.5 Alternatives to the Proposed Project
  • 2.6 Areas of Controversy
3.0 Project Description (Section 3.0 includes subsections 3.1 - 3.6)
  • 3.1 Project Location
  • 3.2 Project Background
  • 3.3 Project Objectives
  • 3.4 Project Characteristics
  • 3.5 Required Permits and Approvals
  • 3.6 Intended Use of EIR
4.0 Environmental Setting, Impacts and Mitigation Measures (Section 4.0 includes subsections 4.1 - 4.12)
5.0 Alternatives (Section 5.0 includes subsections 5.1 - 5.4)
  • 5.1 Introduction and Approach
  • 5.2 Alternatives Considered But Eliminated
  • 5.3 Alternatives Analysis
  • 5.4 Environmentally Superior Alternative
6.0 CEQA Considerations (Section 6.0 includes subsections 6.1 - 6.2)
  • 6.1 Growth Inducement
  • 6.2 Cumulative lmpacts
7.0 References (Section 7.0 includes subsections 7.1 - 7.2)
  • 7.1 Report Preparation
  • 7.2 Persons and Agencies Contacted
Appendices
  1. Notice of Preparation and Comment Letters
  2. Carmel Lagoon MOU
  3. Policy Consistency Table
  4. Air Quality and Greenhouse Gas Impact Assessment
  5. Biological Resources
  6. Supporting Information for the Geology Section
  7. Preliminary 30% Design Draft Report
  8. Supporting Information for the Hydrology Section