CSA 50: Stormwater Management and Flood Control Report

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option
Project Name: CSA 50: Stormwater Management and Flood Control Report
File number (s): N/A
Location:
(Vicinity Map:)

CarmelRiver

Rio Road/Highway 1, Carmel

Assessor's Parcel Number (s): >470 parcels in CSA 50
Planning Area: CarmelArea
Planner:

Carl Holm,AICP, Deputy Director
(831) 755-5103

Monterey County Resource Management Agency
Current Status:

The draft report was posted on 07/08/2014. The CSA50 Advisory Committee conducted a public meeting to review the Draft Report 07/22/2014 The community has until July 30, 2014 to comment.

Environmental Status:

TBD. Preparing preliminary documents will be prepared as needed based on the final report and CIP.

Project Description:

N/A

Key Dates:

 

  • 07/31/2013, Board of Supervisors approved contract with Balance Hydrologic.
  • 06/12/2014, Community Meeting at Carmel Middle School
  • 06/27/2014, draft report due
  • 07/22/2014, CSA 50 Advisory Committee to consider Draft Report and make comments to consultant.
  • 10/07/2014, Consultant to deliver the pre-final report.
  • October 2014, CSA 50 Advisory Committee will consider the pre-final report.
  • 10/31/2014, Consultant to deliver the Final report and CIP
  • December 2014, Final report and CIP to the BOS.
Reports/Documents:

Related Links:
(These links are provided for information only. The County of Monterey does not endorse any of the information found on these sites)



Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer