HazMAT Monitoring Wells & Soil Boring

Environmental Health Bureau oversight of monitoring well and soil boringImage1 construction and destruction is required to ensure protection of our valuable groundwater resources. Improperly constructed wells and improperly destroyed wells and soil borings can act as conduits for contamination to move from surface and sub-surface into the groundwater. Therefore, all monitoring wells and soil borings must be constructed and destroyed under permit from the Monterey County Environmental Health Bureau.

Installation of soil borings or monitoring wells at locations with known or suspected contamination requires submission of a site mitigation work plan, site safety plan and fee. Please see current fee schedule for monitoring well and soil boring permit fees.

Geo Tech Boring

Image2Environmental Health Bureau oversight of monitoring well and soil boring construction and destruction is required to ensure protection of our valuable groundwater resources. Improperly constructed wells and improperly destroyed wells and soil borings can act as conduits for contamination to move from surface and sub-surface into the groundwater. Therefore, all monitoring wells and soil borings must be constructed and destroyed under permit from the Monterey County Environmental Health Bureau.

Installation of soil borings or monitoring wells at locations with known or suspected contamination requires submission of a site mitigation work plan, site safety plan and fee. Please see current fee schedule for monitoring well and soil boring permit fees.

HAZ MAT FORMS AND WORKSHEETS, GEOTECH FORMS AND WORKSHEETS: 

Document Description
Haz Mat Monitoring Well Permit Application
Application for monitoring well destruction, construction. One application per well.

Monitoring Well Permit Application Procedures

The following procedures are for Monitoring Well Construction or Destruction permits. Allow seven (7) working days (from delivery to this office) for the application to be processed.
Haz Mat Soil Boring Permit Application One application per APN: HAZ MAT Soil Boring
GEO TECH Soil Boring Permit Application One application per APN: GEO TECH Soil Boring
Soil Boring Permit Application Procedures The following procedures are for Soil Borings. Allow seven (7) working days (from delivery to this office) for the application to be processed.
Monitoring Well And Soil Boring Destruction Procedures The proper destruction of monitoring wells and exploratory borings after they have served their purpose is necessary in order to: 1.Protect and ensure the quality of ground water and 2. Remove any physical hazardous to humans and animals.

OWTS Forms and Worksheets:

Document Description
OWTS Monitoring Well Permit Destruction/Construction Application
Application for OWTS monitoring well destruction, construction. One application per well.

Related Links - California Well Standard Bulletins


Feedback Link

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer