COUNTY OF MONTEREY
HEALTH
DEPARTMENT
Nationally Accredited for Providing Quality Health Services
Site Mitigation - Environmental Health
Published on November 10, 2016. Last modified on November 08, 2024
Site Mitigation - Guidelines, Forms & Worksheets
Sites may become contaminated with toxic chemicals through illegal dumping or disposal, from leaking underground storage tanks, or through industrial or commercial activities. These sites may pose a hazard to the public health & safety and the environment. Therefore, the investigation and cleanup of these contaminated sites must be conducted under the supervision of the hazardous materials branch. At a minimum, any investigative work shall require a work plan, site safety plan, application for site mitigation and work plan review and a fee. Allow seven working days for processing. Incomplete or unapproved submittals will be returned. Approval of the work plan must be obtained before any work is started. A letter of closure may be written by the Monterey County Environmental Health Bureau based on the findings of the investigation.
Guidelines for Mitigation
Investigation and clean-up of contaminated sites must be conducted according to the Guidelines for Site Mitigation, below. The purpose of these guidelines is to provide a uniform procedure that can be followed to mitigate a contaminated site properly as quickly as possible. The guidelines cover four phases of work that must be accomplished:
- Preliminary site assessment
- Soil and groundwater investigation
- Corrective action implementation
- Verification of monitoring.
Other requirements are also discussed in the Guidelines for Site Mitigation.
All submittals must be signed by a Registered Geologist or Certified Civil Engineer for Subsurface Investigations.
For additional information about also see, the Haz Mat Monitoring Wells and Soil Boring page
Forms and worksheets
Document | Description |
---|---|
Application for site mitigation inspection and work plan review |
Downloadable PDF Application for site mitigation inspection and work
plan review |
Contamination Reporting Procedures | Downloadable PDF - The Environmental Health Bureau (EHB) will be notified within 30 days if during the UST removal, and/or the investigation, installation, or destruction of Monitoring Wells or Soil Borings, that contamination is discovered at, or above the Monterey County Action Levels. |
Site Safety Plan | Downloadable PDF - Site and Safety Plan for Underground storage tank-repairs, removal, installations; Investigation/Remediation of Contaminated sites; Monitoring well & soil Boring. |
Hydraulic Lift And Reservoir Removal Procedure | Downloadable PDF for Procedures for the removal of the Hydraulic Lift And Reservoir Removal |