LAS LOMAS DRIVE BICYCLE AND PEDESTRIAN LANE PROJECT
Work consists of constructing and widening of Las Lomas Drive from Hall Road to Thomas Road, including but not limited to clearing and grubbing, traffic control, excavation and backfill, storm drain pipe installation, retaining walls, drainage system, curb and gutter and sidewalks, bioretention facilities and pavement.
CARMEL VALLEY ROAD RESURFACING PROJECT
The project is to resurface Carmel Valley Road, from Via Del Cinco to Miramonte Road, near Carmel Valley. The work, in general, consists of resurfacing the existing pavement with asphalt rubber and micro-surfacing, including but not limited to localized pavement repair with hot-mix-asphalt, removal and placement of pavement delineation, cold plane asphalt concrete, clearing and grubbing, and traffic control.
HITCHCOCK ROAD & FOSTER ROAD REHABILITATION PROJECT
The project is to reconstruct Hitchcock Road (from Davis Road to State Route 68) and Foster Road (from Davis Road to State Route 68), near the City of Salinas. The work, in general, consists of performing full depth recycling (full depth reclamation) of the existing asphalt pavement and placing hot mix asphalt concrete overlay, including but not limited to micro milling, pavement delineation, adjustment of frame and cover to grade, clearing and grubbing, and traffic control.
ALISAL ROAD RECONSTRUCTION
The project is to reconstruct Alisal Road, from Salinas City Limit to Hartnell Road, near the City of Salinas.
The work, in general, consists of performing full depth recycling (full depth reclamation) of the existing asphalt pavement and placing hot mix asphalt concrete overlay, including but not limited to drainage work, micro milling, pavement delineation, adjustment of frame and cover to grade, clearing and grubbing, and traffic control.
SEAL COAT FY 24 PROJECT
The project is to place a cape seal on Blanco Road, Reservation Road, and River Road, all near the City of Salinas.
The work, in general, consists of placing seal coat on existing pavement, including but not limited to removal and placement of pavement delineation, pavement repair, cold plane asphalt concrete, hot-mix-asphalt overlay, clearing and grubbing, traffic control, and loop detector work.